Olympia Regional Airport

Rehabilitate Taxilanes A, B, C, E and G 


Evaluate the drainage issues and rehabilitate the Taxilanes to preserve an essential Port asset. Rehabilitate the pavement where needed.  

Hangar G Roof and Gutter


The roof and gutter systems for Hangar G have reached their useful lives.  Replacement of them is required to continue using this critical revenue generating asset of the Port.

WSDOT Ramp Tiedowns and Crack Seal


Design and install 10 new aircraft tiedowns on ramp at 7702 Terminal St (currently occupied by WSDOT).  Crack seal and seal coat pavement prior to installation of tiedowns.
  
  
      
     
  
  
For additional information, please send inquiries to engineering@portolympia.com